5-Day Kitchen Cabinet Painting

Give your kitchen a refresh makeover with a refined modern finished designed to elevate the heart of your home

Transform your kitchen with durable sprayed finished and a clean, organized process designed to modernize your space without the cost of a full cabinet replacement.

A Faster & Cleaner Cabinet Painting Process

Our 5-day cabinet painting system is designed to deliver high-quality sprayed finishes while keeping your home clean, organized, and protected throughout the project.

To help minimize disruption and reduce costs for homeowners, we spray cabinet doors on-site inside a professionally built containment system designed to isolate the kitchen from the rest of the home. This helps prevent dust, debris, paint, and odors from spreading while maintaining a faster and more efficient process.

We also use air filtration systems throughout the project to help filter the air inside the workspace and maintain a cleaner environment during preparation and spraying.

Our 5-Day Process

Day 1 — Preparation & Protection

Before any sanding or spraying begins, we carefully prepare and protect the workspace to keep the rest of your home clean and organized throughout the project.

Includes:

  • Protecting floors and surrounding areas

  • Building the kitchen containment barrier

  • Setting up air filtration systems

  • Numbering and organizing cabinet doors

  • Masking and covering the kitchen body

  • Preparing the workspace for sanding and spraying

Day 3 — Primer Application

Once the surfaces are properly prepared, we spray two coats of professional primer designed to create a strong foundation for a durable finish.

Includes:

  • Spraying two coats of primer

  • Inspecting primer coverage

  • Allowing primer to properly dry overnight

Day 5 — Reinstallation, Deep Cleaning & Final Walkthrough

The final day is focused on quality control, reinstallation, and thoroughly cleaning the workspace before removing containment and protection systems.

Includes:

  • Detailed final walkthrough and inspection

  • Touch-ups if necessary

  • Reinstalling cabinet doors and hardware

  • Removing masking and protection materials

  • Vacuuming and deep cleaning the workspace

  • Removing containment barriers

  • Final floor protection removal

Before completion, we carefully inspect the finish to ensure everything meets our standards and the client is fully satisfied with the final result. Our 5-day process is generally for a small to midsize kitchen. Scope and larger kitchen size s will extend the process a day or two more.

Day 2 — Degreasing, Repairs & Sanding

On the second day, we begin preparing the cabinet surfaces for primer by thoroughly cleaning, repairing, and sanding both the cabinet doors and kitchen body.

Includes:

  • Degreasing cabinet surfaces

  • Minor surface repairs

  • Sanding cabinet doors

  • Sanding kitchen body

  • Surface preparation for primer adhesion

Day 4 — Sanding & Paint Application

After the primer cures, we lightly sand the surfaces for smoothness before applying the finish coats.

Includes:

  • Light sanding of primer

  • Surface inspection

  • Spraying two finish coats

  • Monitoring finish consistency and coverage

Clean & Controlled Workspace

To help keep your home cleaner during the cabinet painting process, we build a professional containment system around the kitchen using protective plastic barriers designed to isolate the workspace from the rest of the home.

This containment helps minimize the spread of:

  • Dust

  • Debris

  • Paint overspray

  • Odors

We also use air filtration systems throughout the project to help circulate and filter the air inside the containment area for a cleaner and more controlled environment.

Frequently Asked Questions

Still have questions? Take a look at the FAQ. If you’re feeling ready, go ahead and reach out and request a home consultation.

  • Yes. On the first day, homeowners typically still have access to the sink and refrigerator. During days 2, 3, and 4, access is generally limited to the refrigerator while the kitchen remains inside the containment area. On the fifth day, full kitchen access is restored after final cleaning, reinstallation, and project completion.

  • Yes. We professionally spray both cabinet doors and cabinet frames to create smooth, durable finishes with a factory-finish appearance.

  • Spraying cabinet doors on-site helps reduce costs for homeowners while also creating a faster and more efficient process without sacrificing finish quality.

  • We build a containment system around the kitchen and use air filtration systems to help minimize dust, debris, paint overspray, and odors from spreading into the rest of the home.

  • Most cabinet painting projects are completed within our organized 5-day process depending on kitchen size, repairs, and project scope.

  • Yes. On the final day, we thoroughly clean the workspace, vacuum floors, remove containment materials, and perform a detailed final walkthrough before project completion.

Past Projects

Explore a curated collection of our past work, where imagination meets strategy. Each project reflects our drive to deliver thoughtful, effective solutions.

Client
The Atlas Project

Year
01/01/0001

Year
01/01/0001

Client
The Echo Project

Get in Touch

Whether you have a question, an idea, or just want to say hello, feel free to reach out—we’re here to help.